Infrastructure

I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on
 
 
 
: 25 Acres
 
: Yes
 
 
: Yes
 
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing
 
 
: (Completed / Incomplete)  Completed
 
Brick Wall
 
iii
Permanent buildings constructed
 
 
: (CBRI pattern/ CPWD pattern)
CBRI Pattern
 
iv
School building
 
 
 
: Complete / Incomplete
Completed
 
v
Dormitories
:  Boys __1 Unit CBRI&CPCVD Nos.
   with Warden Residence_NIL_ Nos.
 
 
 
 
:  Girls __0.75 unit Nos.
   with Warden Residence____NIL__ Nos.
 
 
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food
 
 
:  Complete / not complete, Area ______
Completed
 
No shift required. In one batch all students take food as 2 dinning halls available
 
vii
Principal Residence
 
 
:   1 No.
 
viii
Staff Quarters
 
 
 
 
: Type III = __01____ Nos.
  Type II = 28  Nos.
  Type  I  = ___06____ Nos.
  SP Sheds converted into Staff Qrs.:  7 Nos.
 
ix
M.P. Hall
 
: Available / not available Available
x
Workshop
 
: Available / not available  Available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status
 
: Shaft type / Column based
 
:  135KL capacity litres
 
: Working satisfactory / not satisfactory
Working Satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status
 
 
:  40,000 litres
 
: Working satisfactory / not satisfactory
xiii
D.G. Set
 
 
 
 
:  Available
: _Kirloskar____________ make
:   10 KV
: Working: Year of procurement:1996-1997
 
xiv
Sewage Pump
 
: Not available.
xv
Water Pump
 
 
: 12.5 H.P / 2 H.P capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. during day when power supply is available on an average.
 
 
 
 :  Rural / Urban Feeder Rural
:  Completed/ Incomplete
: 42 Nos. of Poles
 
:  24 hrs.
  
xvii
Playfields
 
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
100x100 SQ. Meter Track
200x100 SQ. Meter Track
 
 
 
: not available
:  2  Nos.   – Available
:  2  Nos.   – Available
:  1   Nos. --- Available
:  1   Nos. --- Available
xviii
Water supply
Tube Well
Hand pump
Connection from PHED
 
 
 
: Potable,  __NIL__ Nos.-  working / not working
: Not Potable, 5 Nos.-  working / not working
:  2  hours supply in a day
xix
Rajiv Gandhi Smriti Van
 
:  Available / not available  NotAvailable
xx
Fire fighting arrangement
 
:  Working / not working Working
xxi
Last date of cleaning of
(a)    Septic tank
(b)    Water tanks
 
: 25-05-2007
: 30-05-2007
xxii
Whether area around transformer is fenced
:  Yes  /  No    Yes
xxiii
Whether open wells, if any, are covered from top
:   Yes / No  No open wells in campus
xxiv
Works taken up under M&R fund during current year and last year:-
 
:  Repair works and painting works done in students dormitories in the year 2007-08. Repair works are taken up for the current year
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
2007-08
List Enclosed
-
5,15320
1
2007-08
1)First floor Dormitory 7Bit doors  Renovation
 
 
 
 
2)Dormitory collasable gate removed
 
 
 
 
3)New Boys  dormitory back side compound wall 2 spans repair
 
 
 
 
4)Gate provide for new play field
 
 
 
 
5)M.P Hall doors  repaired
 
 
 
 
6)Academic block New salt water line provided
 
 
 
 
7)Renovation of old N.S.P building  staff for quarter
 
 
 
 
8)Fixing of two iron 30kg gates in academic block,   S R inside distember,M.P hall,Academic blocks repaired
 
 
 
 
 
 
 
 

                 Other Facilities:

                  (1) Swimming Pool : NA

                  (2) Indoor Games: Yes

                  (3) Dance Rooms : Yes

                  (4) Gymnasium : Yes

                  (5) Music Rooms : Yes

                  (6) Hostels : Yes ( Seprate for Boys and Girls)

                  (7) Health and Medical Checkup : Yes